Step 8: Restoration Plan for the summer - the roof
When the roof beams supported the rodents, new cross members attached to the beams. These cross members to move from the house's side up to the ridge and there will be two rooms boards with 120 cm between the beams.
During cross-members and between the roof beams to the ceiling attached. During the roof should be boards that go along with the roof beams.
During the roof will not end up to the ridge where there should be room to later fill the space with wood shavings.
On the roof between the cross beams to roofing felt attached.
Then the roof is added.
On the roof should be tar paper and tar paper on top should be played.
Finally, the tiles are laid on top playing.