Archive for the 'Well' Category

Description of how to dig out of an existing well:

Tuesday, May 20th, 2008

Place the first concrete ring in the old well / hole. Then it's just sitting in the ring o grave with a small short military shovel. It helps with a person who stands above and heaves up the buckets with urgrävt materials. When the ring dropped down with the top lay on the ground floor you put in plaster, or rubber seal on the top of the concrete ring and hang up the next ring on top of the first. The procedure is repeated until you reach at least 7 meters. If the water comes up the water, use a bilge pump.

When the last ring edge is in the ground, pulling up the pump and let the water rise as far as it can. Then empty the well a few days at a time until it is clean o clear water coming out of the pump.

Some links with tips on digging wells:

http://www.jonkoping.se/toppmeny/omkommunen/verksamhetochorganisation/
forvaltningar/miljokontoret/bostad/dricksvattenuregenbrunn.4.7308604a109303e2d1080007585.html
http://www.socialstyrelsen.se/NR/rdonlyres/C6DD8BCC-6C9F-4262-BFA1-821300F87071/3468/20051143.pdf
http://www.socialstyrelsen.se/NR/rdonlyres/6C126F74-7B1B-4FE2-94DB-CE0933D16836/3469/20051144.pdf

VN: F [1.9.15_1155]
Rating: 0 (from 0 votes)
Share
SEO Powered by Platinum SEO from Techblissonline